Centre plans to standardise highway contracts

  • With contractors drawing fire, the Centre plans to standardise national highway contracts by including provisions contained in numerous circulars issued by the road transport ministry into schedule D of the contract document.

Subhash Narayan
Published21 Sep 2024, 06:30 AM IST
Schedule D of national highway contracts includes specifications and standards to be followed by highway contractors and provided specifics in terms of deviation from standards permitted under certain conditions.
Schedule D of national highway contracts includes specifications and standards to be followed by highway contractors and provided specifics in terms of deviation from standards permitted under certain conditions.(Mint)

With highway contractors coming in for strong criticism, the Centre plans to standardise national highway contracts by including provisions contained in numerous circulars issued by the ministry of road transport and highways (MoRTH) into schedule D of the highway contract document.

Schedule D of national highway contracts includes specifications and standards to be followed by highway contractors and provided specifics in terms of deviation from standards permitted under certain conditions.

With a view to standardise the specifications and standards in line with various elements included under circulars issued by MoRTH from time to time, it is proposed that all these elements will now be included in the schedule of contract agreement itself, so that contractors get a clearer picture of work to be and do not deviate from specialisations added at various intervals based on changes in construction parameters.

The contract agreement of engineering, procurement and construction (EPC) and Hybrid Annuity Model (HAM) stipulates that the design, construction and maintenance of highways must follow the specifications mentioned in Schedule D, said an official aware of the development.

Also Read: Government notifies satellite-based toll collection for highways

Further, clause 1.4 of the 2/4/6-laning manual stipulates that all norms for the design and construction of the project will follow Indian Roads Congress (IRC) codes, MoRTH specifications, any other standards referred to in the manual, and any supplement issued with the bid document. Also, specifications contained in MoRTH’s policy circulars issued time to time, will be included in the contract document, the official added.

In 2013, the ministry published MoRTH Specifications for Road and Bridge Works (Fifth Revision), after which several circulars were issued based on the experience gained over the years, feedback from stakeholders, keeping uniformity and eliminating inconsistencies among the manual, specifications and IRC codes. The official said these circulars will be considered for the feasibility study and Detailed Project Report (DPR) and included in Schedule D of the contract agreement.

Also Read: No more potholes? Wort out Indian highways to be mended under new policy

MoRTH is holding stakeholder consultations on its draft circular proposing inclusion of circulars and will finalise the changes in the contract after that.

Queries sent to MoRTH remained unanswered till press time.

“This implementation was long overdue. Through cautious implementation of these standards, we as a nation will save on resources, make our roads/highways more sustainable as well as cost efficient,” said Shailesh Agarwal, partner Risk Consulting, EY India.

“The modification is being proposed for upcoming projects only (to be awarded in future). With respect to ongoing projects (projects awarded but are yet to start and projects where significant work is still pending) a possibility should also be explored to implement these modifications on gain sharing basis between government and concessionaire/contractor,” he added.

Standardisation can bring more investor

The standardisation of contract will help bring more investor interest as the government is also looming to offer more highway projects under build operate transfer route where entire risk of construction is borne by a private investor for calculated gains over the concession period through collection of tolls.

Several circulars were issued by MoRTH since fifth revision of specifications in 2013 for road and bridge works. But these were not mandated by any authority via any implementation order or incorporation in Schedule D. Hence adoption of these circulars was not uniform. In fact, neither schedule D or clauses of 2/4/6 laning manual incorporated specifications coming through various circulars that were issued based on fresh studies on construction or bringing international best practises for highways. Thus, these specifications remained only partially implemented in protects that also once certain changed were bright in manuals of contracts fir construction.

The proposed modifications will make all these circulars mandatory for being considered in Schedule D at DPR stage itself. This will help by aligning i.e. what is to be implemented.

It is for betterment not to plug any non-compliances. This will help in saving costs and making road/highway construction more sustainable, Agarwal said.

Also Read: Elections push highway contruction in slow lane despite high capex

Catch all the Industry News, Banking News and Updates on Live Mint. Download The Mint News App to get Daily Market Updates.

MoreLess
First Published:21 Sep 2024, 06:30 AM IST
Business NewsIndustryCentre plans to standardise highway contracts

Get Instant Loan up to ₹10 Lakh!

  • Employment Type

    Most Active Stocks

    Indian Oil Corporation share price

    179.90
    03:58 PM | 27 SEP 2024
    8.4 (4.9%)

    Tata Steel share price

    166.50
    03:59 PM | 27 SEP 2024
    0.9 (0.54%)

    Bharat Electronics share price

    293.35
    03:57 PM | 27 SEP 2024
    3 (1.03%)

    Bharat Petroleum Corporation share price

    367.30
    03:57 PM | 27 SEP 2024
    22.2 (6.43%)
    More Active Stocks

    Market Snapshot

    • Top Gainers
    • Top Losers
    • 52 Week High

    Balrampur Chini Mills share price

    654.85
    03:50 PM | 27 SEP 2024
    42.35 (6.91%)

    Kalpataru Projects International share price

    1,405.90
    03:52 PM | 27 SEP 2024
    86.3 (6.54%)

    Bharat Petroleum Corporation share price

    367.30
    03:57 PM | 27 SEP 2024
    22.2 (6.43%)

    Bombay Burmah Trading Corporation share price

    2,859.40
    03:41 PM | 27 SEP 2024
    165.75 (6.15%)
    More from Top Gainers

    Recommended For You

      More Recommendations

      Gold Prices

      • 24K
      • 22K
      Bangalore
      77,475.00450.00
      Chennai
      77,481.00450.00
      Delhi
      77,633.00450.00
      Kolkata
      77,485.00450.00

      Fuel Price

      • Petrol
      • Diesel
      Bangalore
      102.86/L0.00
      Chennai
      100.75/L0.00
      Kolkata
      104.95/L0.00
      New Delhi
      94.72/L0.00

      Popular in Industry

        HomeMarketsloanPremiumMint Shorts