Active Stocks
Tue Apr 16 2024 15:59:30
  1. Tata Steel share price
  2. 160.05 -0.53%
  1. Infosys share price
  2. 1,414.75 -3.65%
  1. NTPC share price
  2. 359.40 -0.54%
  1. State Bank Of India share price
  2. 751.90 -0.65%
  1. HDFC Bank share price
  2. 1,509.40 0.97%
Business News/ News / India/  Indian Railways to operate trains at speed of 130 Kmph along the Golden Quadrilateral and Golden Diagonal sections
BackBack

Indian Railways to operate trains at speed of 130 Kmph along the Golden Quadrilateral and Golden Diagonal sections

Indian Railways said that it has utilized the opportunity of the lockdown period and low train movement last year (due to the covid-19 pandemic) to complete all necessary infrastructure up-gradation works

The enhanced speed limits could be achieved due to the systematic and planned strengthening of track & its infrastructure by removing bottlenecks.Premium
The enhanced speed limits could be achieved due to the systematic and planned strengthening of track & its infrastructure by removing bottlenecks.

Indian Railways enhanced the maximum speed to 130 kmph for 1,280 km length out of 1,612 Km in Golden Quadrilateral - Golden Diagonal (GQ-GD) route.This covers the entire GQ-GD route over South Central Railway, except Vijayawada - Duvvada section, where signaling up-gradation work is in progress.

"The enhanced speed limits could be achieved due to the systematic and planned strengthening of track & its infrastructure by removing bottlenecks in these sections on a fast pace," said the Ministry of Railways.

"This included heavier rails, laying of 260 meters Long welded rail panels, improvement of curves and gradients among others," it added.

Railways has utilized the opportunity of the lockdown period and low train movement last year (due to the COVID-19 pandemic) to complete all necessary infrastructure up-gradation works. Based on these improvements done by the Zone, the RDSO/Lucknow conducted oscillation trials through Confirmatory Oscillograph Car Run (COCR) consisting of instrumented coaches of all classes at 130 Kmph speed during July and October last year. During this check, in addition to track parameters, other areas like signaling aspect, traction distribution equipment, locomotive& coach fitness were also checked and recorded.

Accordingly, the South Central Railway zone has received sanction to enhance the maximum speed limits to 130 kmph along the following routes:

1. Golden Diagonal (Grand Trunk) Route: 744 Route Km

i. Ballarshah to Kazipet – 234 Rkm

ii. Kazipet-Vijayawada-Gudur – 510 Rkm

2. Golden Quadrilateral Route (Chennai -Mumbai section): 536 Route Km

i. Renigunta to Gooty - 281 Rkm

ii. Gooty to Wadi - 255Rkm

Already, the maximum speed limits in the High-Density Network (HDN) between Secunderabad – Kazipet (132 Kms distance) had been enhanced to 130 kmph.

As such, including both the Up and Down lines in these sections, a total of 2,824 kms (1412Rkms)has now been made fit to run at a speed of 130 kmph. This covers the entire GQ-GD route over SCR, except Vijayawada - Duvvada section, where signaling up-gradation work is in progress.

It is noteworthy that despite COVID pandemic, Indian Railways has witnessed an unprecedented growth in development of infrastructure, innovation, capacity expansion of network, freight diversification. Railways has used covid challenge as an opportunity to lay the foundation for future development and next level of traveling experience for passengers.

Unlock a world of Benefits! From insightful newsletters to real-time stock tracking, breaking news and a personalized newsfeed – it's all here, just a click away! Login Now!

Catch all the Business News, Market News, Breaking News Events and Latest News Updates on Live Mint. Download The Mint News App to get Daily Market Updates.
More Less
Published: 09 Jan 2021, 07:14 PM IST
Next Story footLogo
Recommended For You
Switch to the Mint app for fast and personalized news - Get App