Traffic congestion and upgradation of infrastructure including the tracks are bigger challenges for the railwaysRailways has planned to run 12 AC locals in Mumbai, six each on the Central and Western suburban lines
1 min read5 Jun 2019The country's first engineless train will replace Shatabdi trains and will run between Delhi and Varanasi
1 min read20 Dec 2018Train 18 will take eight hours in its journey from New Delhi to Varanasi, reducing travel time by six hours
1 min read19 Dec 2018The second trial run of the fully air-conditioned Train 18 that was conducted in Kota, in which it crossed the 180 km per hour speed limit
1 min read3 Dec 2018The second trial run of the fully air-conditioned Train 18 will be conducted in Kota, where the train will be tested at 160 km per hour
1 min read28 Nov 2018Train 18, the ₹100 crore train, was developed by Chennai Integral Coach Factory in 18 months
1 min read27 Nov 2018Sushil Modi warns that after 1 February, transportation of goods without e-way bills would be viewed as an act of tax evasion and such consignments could be liable to be seized
1 min read13 Jan 2018The 12km line will link the eastern and the western suburbs; passenger traffic operations are likely to start by Sept
1 min read1 May 2013The Union Budget contains details about the estimated receipts and the expenditure of the government for a particular fiscal year. The Budget is allotted for the upcoming fiscal year, which runs from 1st April to 31st March of the next year. Here is a quick guide on how the Union Budget is prepared